Category: Broadband
TOTSCo Board Changes
More changes on the the TOTSCO board with a new appointment and another resignation.
Interactive address level map for Project Gigabit Open Market Reviews published
Building Digital UK runs Open Market Reviews every Jan, May and September and we've added the September 2024 data to our mapping system so that the public can easily see what status their property is.
Half a million switches so far using One Touch Switching
One Touch Switching started in September 2024 and to date half a million switches have been completed.
EXCLUSIVE: January 2025 update on broadband availability across the UK, nations and regions
As we enter 2025 we can report that the various full fibre roll-outs continue but with the increasing degree of overlap the overall pace is slowing down.
Octopus offers up to £200 voucher for Cuckoo sign-ups
Octopus Energy is offering gift cards from £100 to £200 on sign-ups to selected Cuckoo broadband packages.
Freedom Fibre connects first Project Gigabit homes in North Shropshire
Freedom Fibre has connected it first customer in North Shropshire as part of Project Gigabit funding by the UK Government.
Broadband Infrastructure — How to dig safely
We look at what is involved when digging underground to build broadband infrastructure in the maze of cables, pipes and other subterranean assets.
BT Group results as group continues aim to be fully UK focused
The BT Group results to the end of 31st December 2024 are now available and we take our dive into the BT Consumer and Openreach statements.
January 2025 update on broadband coverage in Ofcom Area 2 and Area 3
After a break over Christmas its time to look at where the roll-outs of full fibre have been happening in terms of whether in the areas Ofcom thought would have lots of competition (largely urban) and the less competitive rural areas.
EXCLUSIVE: UK reaches 74% premises coverage with full fibre
A combination of slowing roll-outs, Christmas break and overlapping full fibre networks has meant the jump from 73% full fibre coverage of the UK to 74% has taken 39 days.